New TopShim run:

version = topshim 2.0.0
date = 2024-12-12
time = 19:41:39.634
command = topshim 

FINE SHIMMING

Parameters:

probe = Z820201_0105
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 13C
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.6 Hz
Iteration  2: FWHM Before= 0.6 Hz, Target= 0.2 Hz, After= 0.3 Hz
Iteration  3: FWHM Before= 0.3 Hz, Target= 0.3 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.41

shim changes: 
Z	-360
Z2	-238
Z3	-563
Z4	-2652
Z5	-1324

duration = 45 sec
completed successfully
finished Thu Dec 12 19:42:23 2024


========================================================================